PORTER-CABLE PCE345 6-Amp Orbital Jig Saw

ASIN: B00OZEUL7Y
Brand: PORTER-CABLE
Post : 9 mon ago (January 27, 2017) | 117 views.

Feature :

  • 7 position speed dial integrated in the trigger
  • 6 amp motor for more power
  • 4 orbital settings for a variety of materials
  • Lock-on button for prolonged use
  • Tool free blade change


  • List Price : $59.99
  • Price : $59.99
  • Usually ships in 24 hours
  • Price on Fri, 27 Jan 2017 02:21:32

Description :

The PORTER-CABLE PCE345 6 amp Orbital Jig Saw is designed with a 7 position speed dial (0-3200 rpm) integrated into the trigger which provides multiple speed settings for optimal cutting results. The 6 Amp motor delivers more power in demanding applications, and the 4 orbital settings provide best cutting performance in a variety of materials. It offers a lock-on button that provides easier control during prolonged use, and help to diminish user fatique, along with an oversized front and handle overmold that provide greater control and comfort during use. This jig saw also offers tool-free blade change to make blade replacements fast and easy and minimize down time.

PORTER-CABLE PCE345 6-Amp Orbital Jig Saw :

A small fire broke out in the meter room of building 2. Plantation fire department was called out to the scene and luckily no one was hurt. Sources say the cause of this fire was from someone’s meter not working properly causing it to spark up when someone(s) went in to fix it that wasn’t FPL.

Eye witness confirm that our maintainance supervisor along with an electrician(s) were seen entering and exiting the meter room before and after the fire started and when the power went completely out.  Eye witness also confirm these same indivisuals were seen answering questions to the Plantation fire department.

Here my question?

Why was FPL not called out in the first place?  When it comes to our meters and/or electrical issues such a loss of power in one or 2 units, FPL should be the first person to call not our association staff or anyone else for that matter, but that doesn’t seem to be the case today.

FPL arrived on the seen around 3:35-3:45pm were they completely shut down everything. They were able to get half of  building 2′s power back, however the other half of the unit owners in building 2 are experiencing a black out. FPL has not given us an update as to when our power will return but it looks like it can be a day or two hopefully not.  Building 2 unit owners do not deserve to be left in the dark especially because certain individual could not following prodigal.

It’s crazy to know something that may have been such a small issue if they just had taken the proper steps has cost half of building 2 unit owners to go through such an uncomfortable and miserable situation.

Question?

Who do you think is to blame for this? Should the association be responsible?

Please write your comments…

Check out this video that was kindly provided to us…

[wpvideo R03yyngz]

Related Products

WEN 2305 Rotary Tool Kit with Flex Shaft
ASIN: B003BYRFH8
Brand: WEN
List Price : $22.83
$20.53
Price on
Fri, 27 Jan 2017 02:56:52

Armor All 2.5 Gallon, 2 Peak HP, Utility Wet/Dry Vacuum, AA255
ASIN: B003M2F7NI
Brand: ArmorAll
List Price : $49.99
$38.48
Price on
Fri, 27 Jan 2017 02:42:37

Vacmaster High Efficiency Dust Bag, 2 Pack, VKCB001
ASIN: B007ULBB4Q
Brand: Vacmaster
List Price : $30.49
$30.49
Price on
Fri, 27 Jan 2017 03:01:42

Hanperal 45Pcs Steel Wire Wheels Pen Brushes Set Kit Accessories for Dremel Rotary Tool
ASIN: B01KO98PIK
Brand: Hanperal
List Price : $13.58
$13.58
Price on
Fri, 27 Jan 2017 02:59:54


CERTAIN CONTENT THAT APPEARS ON THIS SITE COMES FROM AMAZON SERVICES LLC. THIS CONTENT IS PROVIDED 'AS IS' AND IS SUBJECT TO CHANGE OR REMOVAL AT ANY TIME.